Pavement Management Program
Pavement Management Program Strategies

The City maintains publicly owned streets through various strategies:
  
  • Routine Maintenance
    • Weekly street sweeping
    • Pot hole repair as discovered or reported
    • Crack sealing to prevent water from penetrating the street into the sub grade

  • Extraordinary Maintenance
    • Installation of sub-drains where necessary
    • Slurry sealing residential streets every 7 years based on available funds
    • Overlaying residential streets with a 2” thick new asphalt layer – Every 20 to 25 years
    • Reconstruction – Removal of the asphalt and sub-grade material and reconstruction with new aggregate base and asphalt – When necessary
    • Arterial streets are repaved with new asphalt every 10 to 20 years depending on conditions

Current Paving Activities


FY 16-17 Pavement Rehabilitation Project, Cash Contract No. 16-04

Ongoing Pavement Construction Schedule for Cash Contract No. 16-04

Activity                                          Limits                                      Scheduled Dates

Curb Ramp Construction              Moulton Parkway South Bound:                
                                       Aliso Creek Road to Crown Valley Parkway                  TBD

Curb Ramp Construction                  Avila Road West Bound:                     
                                             Moulton Parkway to La Paz Road                          TBD

Temporary Lane Closures

Roadway                                         Limits                                      Scheduled Dates

Moulton Parkway SB             Aliso Creek Road to Crown Valley Parkway                 TBD

Avila Road West Bound               Moulton Parkway to La Paz Road                         TBD

Construction Impacts:

•    On-street parking will not be allowed from 7:00 a.m. to 5:00 p.m. where and when “NO PARKING"
signs are posted
•    On-street driving and parking will not be allowed from 7:00 a.m. to 5:00 p.m. where and when “NO                 PARKING OR DRIVING” signs are posted
•    Please place your trash bins out the night before your scheduled trash pickup date to allow for early             pickup prior to start of the construction work
•    Uneven pavement, loose gravel and dust are part of the construction work; however, the contractor             will periodically sweep the street
•    Construction equipment and materials may be stored temporarily on the streets
•    At all times, access to your street and driveway will be provided at the end of each construction day
        at 5:00 p.m.
•    Please expect delays and allow time for getting through the construction area Location Map: To see             project locations, please click on the link “Project Location Map
Pavement Reconstruction
Pavement Reconstruction
Pavement Reconstruction

Contact
City of Laguna Niguel
30111 Crown Valley Parkway
Laguna Niguel, CA 92677
Tel: (949) 362-4300
Fax: (949) 362-4340

A great place to call home.